|
|
Air intake of the chimney
|
|
|
Wood support for the fireplace opening archway
|
|
|
The arch of the fireplace opening, with the wood support in place
|
|
|
Stonework on the left side of the fireplace arch
|
|
|
Keystone in the fireplace arch
|
|
|
Fireplace arch with firebrick in the back
|
|
|
Completed fireplace opening; Mark in the background
|
|
|
Completed fireplace opening; Mark and Lucie in the background
|
|
|
Chimney with scaffolding, just before breaking through the roof
|
|
|
Chimney with scaffolding, just before breaking through the roof
|
|
|
Chimney from the mezzanine with the fan airspace and wood stove flue
|
|
|
Completed chimney
|
|
|
Another shot of the completed chimney
|
|
|
Another shot of the completed chimney
|
|
|
Chimney from the mezzanine with the temporary ridge pole support still in place
|
|
|
Chimney from the mezzanine with the fan airspace and wood stove flue
|
|
|
Closeup of the rocks in the chimney at the mezzanine level
|
|
|
Stones gathered from the property for the chimney
|
|
|
More stones gathered from the property for the chimney
|
|
|
Staging area for stones gathered from the property for the chimney
|
|
|
Closeup of a few stones
|
|
|
Staging area for the chimney stones as seen from the roof
|
|
|
Exterior scaffolding for building the chimney above the roof
|
|
|
Closeup of the stonework around the cubby in the kitchen
|
|
|
Closeup of the stonework below the hearth
|
|
|
Chimney in the kitchen galley
|
|
|
Chimney at about the 6' level
|
|
|
Stonework around the cubby in the kitchen
|
|
|
Stonework around the air intake
|
|
|
Stonework around the wood storage cubby
|
|
|
Stonework around the air intake and wood storage cubby
|
|
|
Closeup of embedded river stones
|
|
|
Another closeup of embedded river stones
|
|
|
Stonework on the left side of the wood storage cubby
|
|
|
Stonework on the right side of the wood storage cubby
|
|
|
Carefully fit stones in the chimney
|
|
|
Stonework in the kitchen galley near the floor
|
|
|
Taking a rest after collecting chimney stones from the property
|
|
|
Metal air intake vents in the fireplace box
|
|
|
Fireplace box from above
|
|
|
The timber frame is supported at 5 positions by the chinney. To do so, the chimney had to be built around the free-floating members, then the temporary supports removed.
|
|
|
The hole has been cut into the ceiling to allow for the chimney
|
|
|
Jim and Jack load equipment onto the flatbed for transport to the Hut; this equipment was used to collect stones for the chimney from the property
|
|
|
Mark cleans out the joints between the stones
|
|
|
Mark's diamond saw
|
|
|
Mark grinds the edge off a stone to achieve a proper fit
|
|
|
Mark begins the chimney
|
|
|
Round stones from the Boquet gathered for use in the chimney
|
|
|
The collection of round stones gathered from the river for use in the chimney
|
|
|
The crew that did the initial gathering of stones for the chimney
|
|
|
Staging area for the chimney stones
|